Preview · MVP under construction · Public roadmap and docs.

Devlog · 2026-05-19

Site scaffold and documentation surface

The website moved from a single-page placeholder to a documentation and roadmap site. The scope of this change matches the v0.0 phase: ship a public surface that explains the system without overpromising on what is live.

What landed

  • Astro project with TypeScript and content collections.
  • Three-zone documentation layout with a sticky right rail and a visible footer sitemap on every page.
  • Six engineering diagrams: operating loop, escrow state machine, review decision flow, onchain/offchain boundary, reviewer authority path, and roadmap timeline.
  • XML sitemap, robots.txt with sitemap discovery, devlog and blog RSS feeds.
  • Machine-readable surfaces at /llms.txt, /llms-full.txt, and /site-index.json.
  • External Tally waitlist button across hero, right rail, footer, and the /early-access page. No iframe embed.

What did not change

  • Operating sentence: USDC pays the work. BOUNTY secures the reviewers.
  • Public token facts on Base.
  • Public contact channels.

Next

  • Open the private alpha bounty loop with curated sponsors and reviewers on Base testnet first.
  • Publish public proof of the first paid loops on /status.

← Back to devlog